Project References
Nokia Asiacell 2G and 3G Networks Drive Test and Optimization Project;
- RSCP Ec/No and Best Server analysis
- Pilot pollution spots analysis
- PS and CS calculations such as HSDPA,HSUPA,R99,Voice,video
- CSSR , CDR , Soft/softer handover , I-RAT handover
- Troubleshooting
- Handover analysis
- Missing neighbor analysis
- Hard optimization such as tilt , azimuth adjustment
- Interference analysis with PCTEL scanner and spectrum analyzer
- Cluster drive tests and optimization
- Working with riggers for physical changes of sites and testing for before and after modification
- Preparing reports for 2G/3G network optimization
- 3G DT benchmarking drive tests and reports for Asiacell and other 2 operators(Zain and Korek)
Nokia Zain 2G 3G Networks’ All Field Services;
- SSV tests and reporting for new 2G/3G(2100 and 900) and FTK sites
- Working with riggers for physical changes of sites and testing for before and after modifications
- 3G Cluster optimization(2100 and 900 Bands)
- U900 reframing project and new sites rollout
- 7/24 support for Ashura and Arbaeen events in special shrines
- Costumer Complaints for indoor and outdoor hotspots
- Additional sectors tests and optimization
- Preparing reports for 2G/3G network optimization
- 3G DT benchmarking reports for new 3G(2100 and 900 Bands) clusters and optimization
Nokia-Zain 2G-3G Modernization and Rollout Project;
-
New sites Drive Test and optimization
-
New frequency plan and benchmarking
-
3G Cluster optimization
-
U900 reframing project and new sites rollout
-
New DCS Expansions: SSV DT for new 1800 expansions
-
DT for new frequency plans and optimization and DCS1800 expansions
-
Site reports: Processed per site SSV/SIR reports for new sites & DCS expansions
-
2G DT benchmarking reports for new frequency plans and optimization
-
3G DT benchmarking reports for new 3G clusters and optimization
Nokia-Zain 3G New Sites Rollout Expansion Project;
3G Drive test and reporting for Single and Dual Carriers
-
Voice-Video-SMS
-
R99-HSDPA-HSUPA
-
Routing Area update, Location Area update
-
Cell reselection(3G to 2G,2G to 3G, 3G to 3G)
-
Voice/Video and PS Softer HO
-
Voice and PS IRAT Handover
-
Site Coverage test , site configuration and feeder connection check
-
SC,RSCP,EcNO UARFCN, plots for all carriers
-
R99,HSDPA,HSUPA Throughput calculation for all carriers
-
CSSR,CDR,HOSR
-
Inter-frequency handover for all cells
Nokia-Zain RNC/BSC Upgrade Project;
Performing mentioned tests below in specific sites and clusters for network upgrade
-
Paging UE in Cell_DCH and Cell_FACH state
-
RRC Connection on DCH
-
AMR Speech Service
-
CS Transparent/ Non-Transparent Data Service
-
PS BE Service(uplink 64k/384k + downlink 384k)
-
PS BE Service Set up on HS-DSCH(14400k)
-
PS BE Carried on HS-DSCH/E-DCH
-
1 AMR Speech Service + 1 PS BE Service (AMR: uplink 12.2k+ downlink 12.2k; PS: uplink 64k+ downlink 64k)
-
2 PS BE services(uplink 64k + downlink 64k)
-
SMS Service on CS/PS Bearing
-
AMR Speech Service Soft/Softer Handover
-
Video Telephone Service Soft/Softer Handover
-
PS Service Soft/Softer Handover
-
Combined Service Soft Handover
-
WCDMA->GSM/ GSM->WCDMA/ GPRS->WCDMA Inter-system Handover
-
PS Handover between UMTS and GPRS Function(FORM UMTS <->
GPRS)
-
A Single PS Service Switching from FACH to HS-DSCH
-
Change of Intra-RNC Inter-NodeB Intra-frequency Serving HS-DSCH Cell for a Single PS Service
-
Intra-NodeB Intra-frequency HSUPA Soft Handover
-
System Information Broadcast
-
Cell Barring
-
Establishing a PS UL/DL 5760K/3648K HSPA service, with 2ms TTI on uplink
-
UE TRX Transmit Power
-
Inter-frequency Hard Handover for AMR Speech Service Through IP Transmission
-
SRB Directed Retry During RRC Setup
Nokia-Zain 2G/ 3G New Sites Rollout Project;
2G Drive test and reporting
-
Short calls on each cell both for GSM900 and DCS1800 Bands
-
EDGE tests on each cell for Download and Upload both for GSM AND DCS
-
Handover tests to check inter and intra handover for neighbor definition clarification
-
Coverage test to check site feeder connection and each sector’s coverage area
-
Site configuration check including coordinates, azimuth , Tilts , Height etc.
-
ServCI,BCCH,BSIC,RxLevSub,SQI,RxQaulSub,CSSR ,DL and UL Throughputs
3G Drive test and reporting
-
Voice-Video-SMS
-
R99-HSDPA-HSUPA
-
Routing Area update, Location Area update
-
Cell reselection(3G to 2G,2G to 3G, 3G to 3G)
-
Voice/Video and PS Softer HO
-
Voice and PS IRAT Handover
-
Site Coverage test , site configuration and feeder connection check
-
SC,RSCP,EcNO plots
-
R99,HSDPA,HSUPA Throughput calculation
-
CSSR,CDR,HOSR
Kenya Regulatory QoS project for all 2G-3G-4G Networks in Kenya;
ATLAS Telecom has joint venture with local Kenyan Company(COM21) for Quality of Services in Kenya for Kenya regulatory(CAK)
-
Project Management
-
Project Mobilization
-
Data Collection Plan
-
Project Organization
-
Meetings with costumer(CAK)
-
Technical meetings with local company and CAK
Nokia –Zain 2G-3G Project;
TSS for Radio Planning
-
Evaluation of the site’s usability from radio network planning point of view
-
Draft location for base station and antennae placements
-
Antenna design including Azimuth , Tilts , Height etc.
-
Evaluation of cable losses especially for Rooftop sites
LOS Survey for MW Access
-
Conduct line of sight survey according to LOS request
-
Issuing the LOS report confirming the MW path clearance and indicating the exact
-
position, minimum height and direction of MW antennas
-
Confirmed exact position, minimum height and direction of MW antennas
-
Confirmed LOS condition (LOS / NO LOS)
-
LOS report with agreed level of detail, including pictures and clearance analysis
Single Site Verification (SSV);
Accessibility Test (CSSR KPI)
-
Network Update(CS Location Update, PS Routing Area Update)
-
Voice Call ,Video Call,SMS.
-
PS Call(R99,HSDPA,HSUPA),Multi
-
Evaluation of cable losses especially for Rooftop sites
Mobility Test
-
Idle Mobility Test
-
Idle Mode 3G to 3G
-
CS Connected Mode (HO)
-
PS Connected Mode (HO)
Cluster Optimization;
Cluster Tests
-
CS Voice Call Short Call
-
PS Call Short Cal
-
Throughput Mobility Test
-
Voice Call Long call
-
Idle Mode – Scanner/Handset
Cluster KPIs
-
CSSR Voice
-
CDR CS
-
SHO SR (CS)
-
HSDPA Throughput
NSN - Asiacell 2G Project;
Supporting NSN Optimization team with drive test and rigger teams with log analysis and KPI improvement
In Mosul ,Anbar and Kurdistan for Asiacell GSM900 and DCS1800 bands
-
Cluster optimization
-
Calculations of RxLev , RxQual , ScannedRxLev , SQI, C/I, Speech Codec, Coding schema , RLC throughput , TA
-
Calculation of pre and post swap KPIs such as CSSR,CDR,HOSR both for CS and PS .
-
Troubleshooting for spot analysis such as drop calls , block calls , handover failures ,overshooting cells ,worst cells , interference
-
Drive test and reporting for external interference over Asiacell network
-
MOC , MTC ,SMS ,EDGE Tests
-
Functuanity Tests (Voice,Sms,HTTP,FTP,Handover)
- Handover ,Cell reselection,LAC and PS cell update between diffirent BSCs
Ericsson – Korektel 3G Project;
Drive test for Ericsson on some special sites for Korektel 3G network, Support Ericsson NPO team for launch of 3G network
- Short calls ,long calls, idle mode
- HSDPA tests
- Cross feeder tests
- Coverage tests
- Site functionality tests (static and mobile tests )
Alcatel & Lucent – NEWROZ LTE Project;
Single Site Verification Test for ALU-Newroz Telecom LTE network
-
Checking performance indicators such as ; Accessibility ,integrity, mobility,retainability,radio frequency, physical parameters,data services
-
Plots ,statistics and graphs for PCI,RSRP,RSRQ and SINR indicators
-
Plots ,statistics and graphs Throughput indicators such as ; PDSCH Throughput , PUSCH Throughput
-
Cross feeder tests
-
Coverage tests,intra-site, inter-site Handover tests
- Site functionality tests (static and mobile tests )
Tishknet Wimax Optimization and Planing Project;
Single Site Verification and Cluster tests for Tishknet Wimax network
-
Site Audit to check network physical paramaters
-
Drive test to check PI ,RSSI,CINR,TxPower,D L/UL Throughput per site and cluster
-
Cross feeder tests
-
Coverage tests and analysis
-
Ping tests per cell for network respond performance
-
KPI analysis and optimization
-
Statistics analysis per site
- Planing for new sites
Involved Projects in TURKEY
Drive Test in whole Turkey under Motorola swap for Vodafone network;
- Static test on each sector to check functionality of each TRX
- Mobility test around the site to check site coverage and check feeder swap sectors
- Hotspot (Landmark) tests
- GPRS tests
- Scanner tests
- Benchmark tests
- Cluster acceptance tests
- Drop verification tests
2G Drive Test
- Drive Test for before and after swap of ZTE-AVEA network
3G Drive Test
-
Site Verification Tests for AVEA 3G network
-
Voice ,video R99 tests
- HSDPA ,HSUPA tests
-
Coverage and scan tests
-
Pilot pollution
-
Indoor test and reporting
-
UE Tx Power
-
Swap sector
- AS analysis
2G DT and optimization
Drive testing with many teams and analyzing DT logs for network optimization
Reporting;
-
Kpi : CSSR , CDR , HOSR
-
RxLevel , RxQual ,C/I , SQI , TA , RLC throughput
- Events: call drop , call block , handover failure, Location and Routing area update Failures etc.
3G Drive Test and Optimization
Drive testing with 4 teams for launch of 3G Network of Turkcell with Huawei Vendor Preparing Site Verification Tests for new sites And preparing reports for cluster optimization for 2100 band with 2 carriers
Drive Test and reporting ;
- Voice ,video ,R99,Multi RAB,HSDPA,HSUPA tests
- Coverage test , cross feeder test
- Scanner test
3G Cluster Optimization
-
CPICH RSCP plots analysis
-
CPICH Ec/No-Ec/Io plots analysis
-
CPICH SC, Best Server plots analysis
-
Pilot pollution plots analysis
-
HSDPA modulation , CQI
- PS and CS calculations such as HSDPA,HSUPA,R99,Voice,video,scan
KPI analysis ;
-
CSSR , CDR , Soft/softer handover , I-RAT handover
-
Troubleshooting
-
Handover analysis
-
Missing neighbor
-
Hard optimization such as tilt , azimuth adjustment
- Interference analysis